Today I've been pottering about with some detailing ideas, handrails,pipes electrical boxes, etc. then thought she must be close to sailing weight,although there are quite a few fittings to fit they are very light, so it would be a good time to test the water line, I put a mark on the stem and stern as per plan, and then to the tub test, she floated right on the aft mark and only need 140grams added to the bow to bring her right on the water line, so yet again well done to Deans.
The rest of the fittings will be fitted after priming which will be the next job