we have received a few photo's of Mr oppedijk van veen
Included a few images of my build of the Amethyst. A result of about 6 month intensive work.
With a little help from my friends, and you, the looks of the ship are great, as was the construction process.
The next thing to do is a trial sailing run in a swimming pool and then its maiden run in open water.
Looking forward to it.